Current projects conducted by LafConsulting

Design and construction of the S1 expressway - Oświęcim bypass

Construction of the S1 Kosztowy - Bielsko - Biała road. Section IV Oświęcim Bypass (DK 44 class GP)

The contract includes supervision over the design and construction of the Oświęcim Ring Road, 9 km long. The above section is a part of the S-1 Kosztowy - Bielsko-Biała expressway.

It is a road that will significantly accelerate the journey to the state border with Slovakia in Zwardoń, the airport in Pyrzowice and the A1 motorway.

The investment will run in the vicinity of the former Nazi concentration and extermination camp Auschwitz-Birkenau, and the Contractor will be obliged - when designing and implementing the investment - to comply with the recommendations developed in a special Report on the impact on the world heritage property - Auschwitz-Birkenau, German concentration and extermination camp (1940-1945).

Length of the section: 9 km

 

Design and construction of the S11 expressway

Design and construction of the S11 Koszalin - Szczecinek expressway on the section 3 Koszalin South - Bobolice

The contract includes supervision over the design and construction of the S11 Koszalin Południe - Bobolice expressway. The S-11 road will connect the central Baltic coast with Upper Silesia. The section from Koszalin to Bobolice begins at the Koszalin West junction on the Koszalin and Sianów bypass, and ends at the Bobolice junction, which connects with the current route of DK 11 located south of this town.

Length of the section: 16.8 km

 

Design and construction of the Wroclaw Eastern Bypass 

Design and construction of the Wrocław Eastern Bypass

Supervision over the implementation of the task entitled Construction of a provincial road from the intersection with ul. Grota Roweckiego to the provincial road No. 395 (to the Żerniki Wrocławskie roundabout) and to the border of Wrocław (ul. Buforowa).

Length of the section: 2.5 km

 

Design and construction of the S61 express road

Ostrów Mazowiecka - Szczuczyn, section Śniadowo - Łomża Południe

The contract covers the supervision of the design and construction of the S61 expressway, on the section Śniadowo - Łomża Południe, 17 km long. The above section is a part of the S-61 expressway Ostrów Mazowiecka - Łomża - Stawiski - Szczuczyn - Ełk - Raczki - Suwałki - Budzisko (state border), and is located in two voivodeships: Mazowieckie and Podlaskie. The S61 expressway is an investment that will be a part of the road connection in the Pan-European Transport Corridor, connecting the countries of Western Europe with the Baltic countries.

Length of the section: 17 km

 

 

 

Design and construction of the S61 express road

Ostrów Mazowiecka - Szczuczyn, Łomża Południe - Kolno section

The contract covers the supervision over the design and construction of the S61 expressway, on the Łomża Południe - Kolno section, 13 km long with a bridge over the Narew river, approx. 1.2 km. The above section is a part of the S-61 expressway Ostrów Mazowiecka - Łomża - Stawiski - Szczuczyn - Ełk - Raczki - Suwałki - Budzisko (state border), and is located in the Podlaskie Voivodeship. The S61 expressway is an investment that will be a part of the road connection in the Pan-European Transport Corridor, connecting the countries of Western Europe with the Baltic countries.

Length of the section: 13 km

 

 

 

Design and construction of the S61 express road

Szczuczyn - Budzisko (state group), Szczuczyn - Ełk Południe section

The contract includes supervision over the design and construction of the S61 expressway: section Szczuczyn - Ełk Południe. The length of the section is approx. 23 km. The planned implementation time is 29 months, excluding winter periods (15.12-15.03). The investment will consist of building two sections of the S61 dual-carriageway expressway along with the construction of service roads, engineering structures or environmental protection facilities, and the renovation of selected local roads.

Length of the section: approx. 23 km

 

 

 

Design and construction of the S61 express road

Szczuczyn - Budzisko (state group), Ełk Południe - Wysokie section

The contract includes supervision over the design and construction of the S61 expressway: Szczuczyn - Ełk Południe section. The length of the section is approx. 23 km. The planned implementation time is 29 months, excluding winter periods (15.12-15.03). The investment will consist of building two sections of the S61 dual-carriageway expressway along with the construction of service roads, engineering structures or environmental protection facilities, and the renovation of selected local roads.

Length of the section: approx. 23 km

 

 

 

Design and construction of the S61 express road

Szczuczyn - Budzisko (state group), Ełk Południe - Wysokie section

The contract includes supervision over the design and construction of the S61 expressway: Ełk Południe - Wysokie section. The section is approximately 23 km long. The planned implementation time is 29 months, excluding winter periods (15.12-15.03). The investment will consist of building two sections of the S61 dual-carriageway expressway along with the construction of service roads, engineering structures or environmental protection facilities, and the renovation of selected local roads.

Length of the section: approx. 23 km

 

 

 

Construction of the S6 expressway

Lębork - Tricity ring road, Bożepole Wielkie - Luzino section

The subject of this investment is the design and construction of the S6 expressway on the section Bożepole Wielkie - Luzino, 10.5 km long. The route is a part of the S6 Słupsk - Gdańsk express road in the Pomeranian Voivodeship. The construction includes: construction of the S6 dual-carriageway expressway with the necessary industry and telecommunication works, construction of service roads, engineering structures, environmental protection facilities and renovation of selected local roads.

Length of the section: 10.5 km

 

 

 

Improving the transport connection between the islands of Uznam and Wolin in Świnoujście

Construction of the tunnel under Świna river

The investment includes the design and construction of a tunnel, constituting a permanent crossing in Świnoujście, connecting the islands of Uznam and Wolin. Thus, the new route will replace the existing ferry crossings. The total length of the investment is 3.4 km, of which 1.44 km runs under the Świna River in a tunnel with a diameter of 12 m.

Length of the section: 3.4 km

 

 

 

Construction of the S7 road

Section: Chęciny - Jędrzejów

"Construction of the S7 road Radom (Jedlińsk) - Jędrzejów, Chęciny - Jędrzejów section” will connect the Kielce bypass built in 2013 with the existing eastern bypass of Jędrzejów. The new route will contribute to improving traffic safety and driving comfort. Thanks to the investment, the travel time between Warsaw, Kielce and Krakow will be significantly shortened, and over 90 percent of the Świętokrzyskie section of road No. 7 will have the full parameters of the express route.

Length of the section: 21.553 km

 